Labour savings from passive irrigation:
The system collects and redirects road-level stormwater directly to tree root zones, reducing reliance on frequent manual watering regimes.
Integrated filtration system:
A dual-stage steel silt basket captures litter, debris and fine sediment, helping prevent blockages and protecting downstream soil vault systems.
Low maintenance design:
Requires only a 3–6 month maintenance cycle, subject to site conditions, delivering significant time and labour savings for council maintenance crews.
Fully contained precast unit:
Supplied as a single, integrated system with pre-assembled internal components, simplifying installation and reducing on-site construction time.
Pedestrian-safe configuration:
Features a Class C pedestrian-safe grate, making it suitable for footpath, nature strip and roadside environments.
Kerb-integrated solution:
Designed to match a B2 kerb profile for installation directly within the kerb channel, providing a discreet, robust and functional streetscape outcome.
Overflow protection:
Installed upstream of a side entry pit to ensure excess stormwater is safely captured by the existing municipal drainage network during high rainfall events.
Sustainable and durable:
Manufactured using SVC Eco concrete containing recycled waste and reduced embodied carbon, supporting council sustainability targets while delivering long-term asset performance.