SVC’s Dual Chamber Pit is an integrated, fully contained precast solution designed to streamline onsite stormwater management. During periods of heavy rainfall, the DCP helps to reduce road flooding and pooling around drainage points by slowing and regulating the rate of stormwater discharge from a site. Trusted by councils and contractors alike, this innovative pit system simplifies onsite assembly, enhances flow control and ensures long-term structural integrity in both greenfield and retrofit projects.
Used as a baffle pit or orifice pit, the Dual Chamber Pit’s internal two chambers are separated by a central steel baffle. Stormwater enters the inlet chamber via the grate above, where any carried sediment and debris settles at the base. The clean water passes through a trash grate for further debris screening, then through an orifice plate into the outlet chamber for controlled release.
The versatility of SVC’s Dual Chamber Pit allows customers to customise pit size, cover load rating, baffle positioning, orifice size and trash grate options, enabling an adequate solution to suit most site requirements. The DCP is delivered to site pre-configured and assembled, allowing simple, fast installation. This efficient, space-saving solution is ideal for smaller commercial and residential projects needing to satisfy council drainage and water quality objectives.